Electric Rates at Merced Irrigation District 

PDFDescriptionDemand
RES-2 PDFRESIDENTIAL GENERAL SERVICE — This schedule is offered to single-phase and poly-phase residential service in single-family dwellings and apartments separately metered by Merced Irrigation District; to single-phase and poly-phase service in common areas in a multifamily complex; and to all single-phase and poly-phase farm service on the premises operated by the person whose residence is supplied through the same meter. 
Net Energy Metering PDFNET ENERGY METERING — CLOSED TO NEW APPLICATIONS — This schedule is applicable to all residential, small commercial (under 20 kW), commercial, industrial, or agricultural customers, who use a solar electrical generating facility with a capacity of not more than one megawatt that is located on the customer’s owned, leased, or rented premises, is interconnected and operates in parallel with the District’s electric grid, and is intended primarily to offset part or all of the customer’s own electrical requirements. 
Net Energy Metering 2.0 PDFNET ENERGY METERING — This schedule is applicable to all residential customers who use a solar electrical generating facility with a capacity of not more than one megawatt that is located on the customer’s owned, leased, or rented premises, is interconnected and operates in parallel with the District’s electric grid, and is intended primarily to offset part or all of the customer’s own electrical requirements. 
PDFDescriptionDemand
EGS-2 PDFCOMMERCIAL & SMALL INDUSTRIAL GENERAL SERVICE — This schedule is offered to small industrial and commercial customers having demands of less than 35 kilowatts.0 – 35 KW
ED-4 PDFSMALL DEMAND GENERAL SERVICE — This schedule is offered to industrial and commercial customers having demands of 35 kilowatts or greater in any month during the previous twelve (12) months and less than 500 kilowatts.35 – 499 KW
ED-3V PDFMEDIUM DEMAND GENERAL SERVICE — This voluntary schedule is offered to industrial and commercial customers having demands of 200 kilowatts in each of the previous twelve (12) months and less than 500 kilowatts, with an annual load factor equal to or greater than 70%.200 – 499 KW
ED-3 PDFMEDIUM DEMAND GENERAL SERVICE — This schedule is offered to industrial and commercial customers having demands of 500 kilowatts or greater in any month during the previous twelve (12) months and less than 1,000 kilowatts.500 – 999 KW
ED-2 PDFLARGE DEMAND GENERAL SERVICE — This schedule is offered to industrial and commercial customers having demands of 1000 kilowatts or greater in any month during the previous twelve (12) months.1000 KW and Above
ED-2P PDFLARGE DEMAND PRIMARY SERVICE — This schedule is offered to industrial and commercial customers having demands of 1000 kilowatts or greater in any month during the previous twelve (12) months. Customer’s delivery voltage must equal or exceed 12,000 volts.1000 KW and Above
ED-1P PDFLARGE DEMAND GENERAL SERVICE –This schedule is offered to industrial and commercial customers having a total combined non-coincident demand at a single location, in any single month, of 15,000 kilowatts or greater, within a 12 month period. Customer’s delivery voltage must equal or exceed 12,000 volts.15,000 KW (Non-Coincident) and Above
TR-1 PDFLARGE DEMAND TRANSMISSION SERVICE – This schedule is offered to industrial and commercial customers having demands or requirements of 5,000 kilowatts or greater in any month in a 12 month period and taking electric service from Merced Irrigation District’s 115 kV transmission voltage.5000 KW and Above
PDFDescriptionDemand
MD-3 PDFMUNICIPAL & NON-PROFIT MEDIUM DEMAND GENERAL SERVICE –This schedule is offered to municipalities and non-profit organizations having demands of 500 kilowatts or greater in any month during the previous twelve (12) months and less than 1,000 kilowatts.500 – 999 KW
MD-4 PDFMUNICIPAL & NON-PROFIT SMALL DEMAND GENRAL SERVICE — This schedule is offered to municipalities and non-profit organizations having demands of 35 kilowatts or greater in any month during the previous twelve (12) months and less than 500 kilowatts.35 – 499 KW
PDFDescriptionDemand
AG-2 PDFAGRICULTURAL DEMAND GENERAL SERVICE – This schedule is offered to customers if energy is used for agricultural end use that does not change the form of the agricultural product.0 – 199 KW
PDFDescriptionDemand
LSC PDFSTREETLIGHTING – CUSTOMER OWNED AND MAINTAINED — This schedule is applicable to lighting service for the illumination of public streets, alleys, highways and other publicly-dedicated outdoor places. It is available to cities, counties, lighting districts or other public bodies where the District supplies electrical energy only, and the customer furnishes, installs, owns, operates and completely maintains lighting units including switching and all other associated equipment. 
LSC-1 PDFSTREETLIGHTING – DISTRICT OWNED AND MAINTAINED — This schedule is applicable to MID owned or maintained lighting installations which illuminate streets, highways and other public dedicated outdoor ways and places which generally utilize MID distribution facilities. 
PDFDescriptionDemand
MEF PDFFLAT RATE SERVICE — This schedule is applicable to small, constant, non-metered incidental loads for utilities, state agencies, and applicable special districts where the customer owns and maintains the equipment. Such loads would include:  Path Lights, Irrigation Controllers, Cathodic Protection Stations, Motor Radial Gates, Pressure Point Automatic Watering Systems, Traffic Counters, Flashing Beacons, Sign Illumination. 
PDFDescription 
PCA PDFPOWER COST ADJUSTMENT – The Power Cost Adjustment (PCA) is applicable to all Energy Resources customers served by the District and to all kilowatt-hours billed under all rate schedules.  Effective 07/01/2026 the PCA is set at $0.01 per kilowatt-hour. 
EC PDFENVIRONMENTAL CHARGE – The Environmental Charge (EC) is applicable to all Energy Resources customers served by the District and to all kilowatt-hours billed under all rate schedules.  Effective 05/01/2026 the EC is set at $0.00407 per kilowatt-hour. 

MID is a publicly owned, not-for-profit utility governed by a locally elected Board of Directors. We provide reliable electricity at cost and do not earn a profit on power or energy sales.

To ensure rates accurately reflect the cost of providing safe, reliable, and affordable service, MID periodically reviews its electric rates. The last update to base rates occurred in 2019.

Based on a recent Cost of Service study, MID’s electric rate changes were approved by the MID Board of Directors on June 2, 2026. The updated rates will take effect beginning with the July 1, 2026 billing cycle, with customers first seeing these changes on their August bills.
 

Why Rates Are Changing

  • These rate updates align with the recent Cost of Service study
  • To improve alignment between power supply costs, timing of procurement, and customer energy use

Impact of Rate Updates

  • Overall net system‑wide average cost reduction of approximately 9%
  • Base energy rates increase, while the Power Cost Adjustment (PCA) is reduced
  • Rate design remains largely the same across customer classes

Current vs. New Rates Comparison

The rate changes below have been approved by the MID Board of Directors as of June 2, 2026, and will be implemented beginning with the July 1, 2026 billing cycle. Customers will first see these changes reflected on their August bills. Additional information and resources are available in the attachments below.
 

Board Approved Rate Changes by Rate Class PDF

MID Power Cost Adjustment Schedule PDF

MID Environmental Charge Schedule PDF

MID Electric Rate Study Report 6/4/26

Cost of Service and Rates Update Board Presentation from April 7, 2026

NEM 2.0 Rate Updates FAQ

Home Energy Efficiency - Merced Irrigation District Electric Rates

Comments are closed.